We take the design risk, run authority approvals in parallel with early works, and reach first pour months ahead of a conventional tender. The federated model is the spine of the contract.

23%
Average programme compression
Request a proposal Or book a meeting

What this includes — and what it doesn't.

Every contract dispute we have seen began life as an assumption nobody wrote down. Ours are written below, before anything is signed.

In scope

  • Concept and schematic design
  • Detailed design and authority approvals
  • Value engineering workshops
  • Construction and commissioning
  • As-built documentation

Not included

  • Third-party design audits
  • Specialist acoustic consultancy

Exclusions are negotiable. Writing them down is what keeps the tender price and the final account within shouting distance of each other.